Installation & Commissioning Services

Experienced site engineers who erect, align, start up and tune your feed line — then train your operators until the plant runs at rated capacity. Proper installation is what protects your equipment investment.

Installations completed
Field service engineers

Even the best equipment fails under poor installation

Misaligned coupling, loose foundations, incorrect die clearance or a wrongly phased motor will cut output, raise energy cost and shorten bearing life — problems that show up weeks after the installers have gone home.

Our installation teams follow the same engineering standards used to design the line. We verify every anchor bolt, every alignment value and every interlock signal against the commissioning checklist, so the handover is based on measured results, not assumptions.

What our site team delivers

From the first survey to the signed handover protocol.

Site survey & planning

Foundation and layout verification, lifting plan, installation schedule and safety briefing before any equipment is moved.

Mechanical installation

Equipment placement, anchor grouting, coupling and belt alignment, piping, platforms and guarding, all against drawing tolerances.

Electrical & automation

Cabinet wiring checks, motor rotation tests, sensor and interlock verification, PLC parameter loading and HMI setup.

Cold & hot commissioning

No-load runs of every machine, then loaded trial production to tune die gap, steam conditioning, cooling and packing accuracy.

Operator training

Shift-level training for operators and maintenance staff: startup, shutdown, routine care, fault diagnosis and safety rules.

Safety audit & handover

Full-load check, safety sign-off, spare parts inventory and a written handover protocol with capacity performance data.

Five stages from arrival to handover

Pre-arrival preparation

Remote review of civil works and utilities, equipment arrival check, and a day-by-day installation schedule agreed with your team.

Unloading & placement

Equipment is positioned per layout drawing: elevations, centerlines and anchor bolts verified before grouting.

Mechanical & electrical

Assembly, alignment, cabling and signal tests are completed machine by machine, with a checklist signed for each unit.

Commissioning

Cold runs confirm all interlocks; hot trial production with your materials tunes the process to rated capacity and quality.

Training & handover

Operators are trained on the running line, documentation is delivered, and the plant is formally handed over.

FAQs

How many engineers come and for how long?

A typical small-to-medium line needs 1–2 engineers for 7–15 days; larger plants need 2–4 engineers for 15–30 days. Exact headcount and duration are defined in the contract based on plant scale and local labor availability.

Civil works, power supply, compressed air and steam (where used) should be complete per our drawings, and equipment should be delivered to site. We provide a readiness checklist in advance and can dispatch an engineer for a pre-installation survey if needed.

Yes, case by case. We can supervise or execute installation of third-party equipment already present in the line, subject to a technical review of its documentation and condition.

Every project includes a warranty period with remote support included. Contact our after-sales team and we will diagnose remotely first — most issues are resolved within hours. If on-site work is needed, an engineer is dispatched. See After-sales Service for response commitments.

Yes. The training program covers both operation and routine maintenance: die and roller changes, lubrication, sensor calibration, belt replacement and common fault diagnosis, so your team can handle daily care independently.